How to price a dumpster rental: sizes, days, tons and overages
Most roll-off companies price each dumpster size as a flat base price that includes a set number of rental days and a set weight allowance, then charge per extra day and per extra ton. The base price has to cover the delivery and pickup trips, your disposal cost for the included tons, and your share of the can and truck. Fees for swaps, dry runs and banned items cover the extra trips and handling.
That structure is simple for customers and protects you from the two things that sink dumpster margins: cans sitting out too long and loads that weigh more than expected.
What does a dumpster rental actually cost you?
Before setting prices, break one rental into its costs. These are the main ones:
- The haul: driver time and truck cost for delivery and pickup, including the trip to the landfill or transfer station. Each round trip is a real cost, so count them.
- Disposal: the tipping fee per ton at your local landfill or transfer station, times the weight in the can. This is often your largest variable cost, and it varies a lot by region.
- The can: what you paid for it, spread over its working life, plus repairs and paint.
- The truck: payment or depreciation, insurance, fuel, tires and maintenance.
- Overhead: your yard, office, phones, software, marketing, insurance and your own salary.
Worked example for a 20-yard rental (made-up numbers to show the method):
- Two round trips, delivery and pickup with a dump run, at 1.5 hours each: 3 hours × $95 per truck hour (driver, truck and fuel) = $285
- Included tons: 2 tons × $70 tipping fee per ton = $140
- Share of the can's cost and upkeep for one rental: $25
- Share of overhead: $60
- Cost: $510
- With a 25 percent margin: $510 ÷ 0.75 = $680 base price
Your tipping fees, drive distances and truck costs will be different, so do this math with your own numbers for every size you rent.
Which sizes should you offer, and how should they be priced?
Common roll-off sizes in residential and small contractor work are 10, 15, 20, 30 and 40 cubic yards. You don't need all of them. Many companies start with two or three sizes that match their customers: small cleanouts and roofing jobs on one end, remodels and construction on the other.
Price each size with its own base price, included days and included tons. Bigger cans usually include more tons, because the loads in them weigh more. But be careful: a heavy material like concrete, dirt or shingles can overload a can by weight long before it's full by volume. Many companies offer specific rules or smaller cans for heavy debris, and some trucks and landfills have their own weight limits.
How many days and tons should the base price include?
Included days. A week is a common default for residential rentals because most cleanouts and small remodels fit in it. Contractors may need longer. Whatever you choose, it should match how long the typical customer actually keeps the can. If almost everyone keeps it twice as long as included, either your included days or your extra-day fee needs another look.
Included tons. Set it near the typical load weight for that size and type of customer. Too low, and almost every customer pays an overage, which feels like a hidden fee. Too high, and you're giving away disposal on every light load.
The goal is that most customers pay the base price only, and the overages apply to the ones whose use costs you more.
How do you set extra-day and overweight charges?
Extra days
Each extra day a can sits on a job, it's not earning money on another job. The extra-day fee should reflect what the can could be earning elsewhere, not just a token amount. A common way to set it is to divide your expected rental revenue per can per month by the number of days in a month, then round.
Count days the same way every time. For example: the rental day count runs from drop-off to pickup, with a minimum of one day. Write it on the quote.
Extra tons
The overweight charge should at least cover your tipping fee per ton, plus the handling of the heavier load. Many companies add a margin on top. Bill it by the scale ticket weight, to a sensible precision like a hundredth of a ton, and keep the ticket on file. A photo of the scale ticket on the invoice ends most disputes before they start.
What other fees are fair to charge?
These are common in the roll-off business. Explain each one up front.
- Swap fee: you pick up a full can and drop an empty one, or dump and return the same can. It's a full haul, so price it close to one.
- Dry run or trip fee: the driver arrives and can't deliver or pick up, because a car is blocking the spot, the can is overloaded above the rim, or the gate is locked. Your truck and driver time was used either way.
- Banned and special items: mattresses, tires, appliances with refrigerant, batteries and some electronics often cost more to dispose of or must be handled separately. Charge a set fee per item, and keep a clear list of what's not allowed at all, like hazardous waste, which follows its own rules.
- Street permit: if the can goes on a public street, many cities require a permit. Either pull it for the customer and pass the cost through, or tell them it's their responsibility.
- Fuel or environmental fee: some companies charge a flat fee per rental to cover fuel swings or disposal regulations. If you charge one, show it on the quote. A fee that only appears on the final invoice feels like a trick.
- Relocation: moving a can to a different spot on the same property.
Should you bill up front or after pickup?
A common approach is:
- Bill the base price up front, when the order is placed or at delivery. This covers your costs if the customer disappears, and it's what most customers expect.
- Bill extras after pickup, once you have the dump ticket: extra days, extra tons and any item fees, on one final invoice.
For long contractor rentals, bill extra days every 30 days instead of waiting until the can comes back. It keeps the balance from growing large and gives the contractor a regular, predictable bill. Our post on payment terms for home-service businesses covers when to offer net terms to contractors.
How do you keep cans from sitting out?
Every day a can sits past its pickup date costs you a rental. A few habits help:
- Confirm the expected pickup date at booking and in the delivery message
- Remind the customer a day or two before pickup
- Review a list of cans that are past their pickup date every morning
- Watch utilization by size, so you know when to add cans and which sizes sit in the yard
FAQ
Should I show prices on my website? Many roll-off companies do, at least as a starting price per size with what's included. It saves phone time and attracts customers who are ready to book. Make included days, tons and common fees clear.
How do I quote heavy debris like concrete or dirt? Many companies use a smaller can for heavy materials and set a flat price for clean loads, because weight limits apply long before the can is full. Check what your truck and your disposal site allow.
Do I need a permit for every dumpster? Not usually on private driveways, but rules vary by city and some HOAs restrict dumpsters. Street placement often needs a city permit.
What if the customer disputes the weight? Show the scale ticket. Taking a photo of the ticket and attaching it to the rental makes this simple.
How ServFlo helps
On the Grow and Pro plans, ServFlo runs a roll-off business end to end. Each dumpster size has a base price with included days and tons, an extra-day price and an extra-ton price, and each rental keeps the prices it was ordered at. Drivers record drop-offs, swaps, pickups, dry runs and dump tickets with a photo in the app. The final invoice adds extra days, extra tons and charges like swap fees, trip fees and permits, and long rentals can be billed every 30 days. A fleet view shows which cans are out, coming back and overdue. See scheduling and dispatch, quotes and invoices, and pricing.